Flagship project · 2026 – 2028

The Electricity Network Improvement Project

Rehabilitating and strengthening Congo's power grid. CELEC is proud to be part of it.

The project

Modernising the power grid for the long term

The Electricity Network Improvement Project is modernising substations, lines and transformers to durably improve the electricity supply to homes, businesses, industries and public services.

Alongside the Ministry of Energy and Water and E2C, CELEC is taking part in PAREL: 220 kV line, primary substation, MV/LV substations and networks in Brazzaville and Pointe-Noire.

PAREL in figures

  • 45 bnCFA francs of investmentFinanced by a syndicate of 5 local banks
  • 18 monthsproject durationSchedule 2026 – 2028
  • +100,000householdsA more stable power supply
  • 300jobs createdDuring the works

Key works

Six projects to strengthen the grid

  • Djiri – Mpila 220 kV line

    Build a 16 km link to strengthen power transmission to Brazzaville.

    16 km · 220 kV
  • Mpila primary substation 2 × 110 MVA

    Create new transformation capacity and improve load distribution.

    2 × 110 MVA
  • Substations and satellite stations

    Refurbish transformation, protection and control equipment and auxiliaries.

    Protection · control
  • MV/LV substations

    Build and rehabilitate nearly 130 MV/LV substations, including 30 new ones: 20 in Brazzaville and 10 in Pointe-Noire.

    ≈ 130 substations
  • MV/LV networks

    Strengthen and extend feeders, lines and cables to improve supply to neighbourhoods.

    Feeders · lines · cables
  • Migration from 6.6 kV to 20 kV

    Gradually upgrade the voltage level of Brazzaville's distribution network.

    6.6 kV → 20 kV

The works

Works by city

PAREL covers Brazzaville and Pointe-Noire. Choose a city on the map to see the planned works.

GABONCAMEROONCENTRAL AFRICAN REP.DR CONGOAtlanticOcean

Tap a city to see its works.

Brazzaville departmentLaunch in late 2026

Brazzaville

220 kV line, Mpila primary substation, new MV/LV substations and migration of the grid to 20 kV.

Scope of works

  • 220 kV16 km Djiri – Mpila line
  • 2 × 110 MVAPrimary substation in Mpila
  • 20 newNew MV/LV substations
  • 20 kVMigration of the distribution network from 6.6 kV to 20 kV

PAREL · Brazzaville

20 new MV/LV substations under construction

PAREL provides for 30 new MV/LV substations: 20 in Brazzaville, located on the map, and 10 in Pointe-Noire.

Indicative locations · Imagery © 2026 Airbus, Google Earth

Schedule

PAREL milestones

18 months of works · indicative schedule, updated as the works progress.

  1. Late 2026

    Launch

    Current phase

    Team mobilisation, detailed design and equipment procurement.

  2. 2027

    Works

    220 kV line, Mpila primary substation, MV/LV substations and networks in Brazzaville and Pointe-Noire.

  3. 2027 – 2028

    Commissioning

    Gradual re-energisation and upgrade of Brazzaville's network to 20 kV.

  4. 2028

    Acceptance

    Final inspections, acceptance of the works and handover to the network operator.